🧱 Concreting in Brisbane
Compare 175 concreting operators across Brisbane. Driveways, paths, slabs and decorative concrete.
Plain driveway, per square metre: $95 – $165
Concrete work in SEQ covers everything from house slabs to decorative pours (exposed aggregate, stamped, polished). Pricing varies hugely by finish: a plain driveway and a polished-concrete slab look the same on quote until you read the line items.
Concreting operators in Brisbane
Verified operators ranked first. Listed entries are sourced from public records and may not yet be claimed by the operator.
About Town Concrete Contractors
Listed📍 Nundah
ACR Structural Landscaping
Listed📍 Mansfield
Adheseal
Listed📍 Stafford
All Aussie Concreting
ListedAll Cleared Demolition
Listed📍 Yeronga
Allure Concrete Solutions Pty Ltd
Listed📍 Geebung
Alpha Concrete Cutting
ListedARC Contracting
ListedAustral Precast Salisbury
ListedAustralian Concrete Pumping
Listed📍 New Farm
Australian Landscape Supplies
ListedBaseline Polished Concrete
Listed📍 Mansfield
BCF concrete floors
Listed📍 Geebung
Beanies Concreting’s PTY LTD
Listed📍 Cleveland
BESS Concrete Pty Ltd
Listed📍 Geebung
BGI Group
Listed📍 Spring Hill
BJB Concreting Pty Ltd
Listed📍 Alexandra Hills
Blend Concrete Design
Listed📍 Geebung
Boral Construction Materials
Listed📍 Milton
Bravo Consult - Civil Engineers Brisbane
Listed📍 Milton
BRICKLAYERS BRISBANE PTY LTD
Listed📍 Victoria Point
Brisbane Concrete Removal
Listed📍 Chermside
Brisbane Concrete Sleeper Retaining Walls
Listed📍 Fortitude Valley
Brisbane Concreter
Listed📍 Stafford
BRISBANE EXPRESS CONCRETE SERVICES
Listed📍 Redland Bay
Brisbane Polished Flooring
Listed📍 Teneriffe
Cemento Concrete Services
ListedCentenary Landscaping Supplies
ListedChelmstone
ListedShowing top 30 of 175 operators. Refine by area below.
📅 When to book
Plain pours 2-4 weeks. Decorative work (exposed aggregate, polished, stamped) needs 3-6 weeks for material lead-time. Avoid wet-season pours where possible.
📋 License & verification
Concrete work over $3,300 requires QBCC license. Structural slabs (homes, retaining) need engineer-certified design + QBCC builder, not just a concreter.
⚠️ Common mistakes
- •Skipping the moisture barrier on a slab — leads to rising damp years later
- •Ordering inadequate concrete strength for the application — N20 for footpath, N25 minimum for driveway, N32+ for structural
- •Under-speccing reinforcement or thickness for the load — a driveway carrying vehicles needs more than a path; under-spec concrete cracks and can't be patched cheaply
Frequently asked questions
How long before I can drive on a new driveway?
Foot traffic at 24 hours, light vehicles at 7 days, heavy trucks at 28 days when concrete reaches design strength. Don't park heavy vehicles or trailers on it before then.
What's the difference between exposed aggregate and stamped concrete?
Exposed aggregate reveals the stone within the mix — durable, slip-resistant, costs ~30% more than plain. Stamped concrete is texturally pressed to look like pavers or tiles — high upfront cost but no jointing maintenance.
How much does a concrete driveway cost in SEQ?
Plain concrete is cheapest per square metre; exposed aggregate and coloured finishes cost more, and stamped or polished more again. Site prep, fall, drainage and access drive the final number — get an on-site measure-and-quote.
How long before I can drive on new concrete?
You can usually walk on it after 24-48 hours, but wait about 7 days before driving a car onto a new driveway and up to 28 days for full strength. Loading it early is a common cause of cracking.